1,136
edits
m (→History) |
m (Updated template names) |
||
| (10 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
{{ | {{Equipment page removed | ||
|removedby=Protospace | |||
|removaldate=2014-07-23 | |||
|removalreason=nobody ever used it | |||
|replacements=None. Probably never will be any; this machine's lack of use inspired a moratorium on pick and place machines at Protospace. | |||
|toolname=Pick & Place | |toolname=Pick & Place | ||
|model=Multitronics 2000LX | |model=Multitronics 2000LX | ||
| Line 12: | Line 16: | ||
|itemphoto=[[File:Pick_N_Place.jpg|350px|thumb|right|]] | |itemphoto=[[File:Pick_N_Place.jpg|350px|thumb|right|]] | ||
}} | }} | ||
[[Category:Electronics tools (removed)]] | |||
[[Category:Computer-controlled tools (removed)]] | |||
==Specs== | ==Specs== | ||
| Line 29: | Line 36: | ||
* 04Mar2013 - Jeremie, Mark, Colin, Dan D, Danny repair broken air intake, [[Compressor_(White)]] was repaired and works well. Circuithacker has [[Compressor_Small|built a compressor]] for it. Air drier installed. Replaced CRT with large LCD. Diagnosed & labelled all feeders. | * 04Mar2013 - Jeremie, Mark, Colin, Dan D, Danny repair broken air intake, [[Compressor_(White)]] was repaired and works well. Circuithacker has [[Compressor_Small|built a compressor]] for it. Air drier installed. Replaced CRT with large LCD. Diagnosed & labelled all feeders. | ||
* ??Apr2013 - Robb donated larger security TV to replace miniature CRT. | * ??Apr2013 - Robb donated larger security TV to replace miniature CRT. | ||
* 15Aug2013 - John Jardine & Mike Hermann sponsored the device. See Sponsorship Project Status | |||
==Sponsorship Project Status== | |||
Leads: John Jardine & Mike Hermann | |||
Pitch: Made to members on 20Aug2013 during irregular Tuesday meeting. No objections. | |||
Goals: | |||
#Have an operational Pick and Place by 19Nov2013 | |||
#Have at least one project ready to be fab'd by the machine | |||
Status: | |||
#Not started. Expected completion on/before 19Nov2013 | |||
#Work In Progress, Expected completion on/before Sept 10 | |||
==Sponsorship Project weekly updates== | |||
* 20Aug2013 - 90 Days of oxygen requested, no objections from membership. This time is to be used to define what needs to occur to get the machine up and running, ready for use and to make those repairs/enhancements. | |||
* 20Aug2013 - Goal(2):John Jardine is actively working on board as a project for the Pick and Place. Design should complete this week (by Friday 23AUG2013) with PCBs and parts being ordered immediately. These will be left at PS during his extended absence waiting for the Pick and Place to become operational. | |||
* 23Jul2014 - Pick and Place has been sold. Removed this project from "Ongoing Projects" category. | |||